How to Dispatch an Inspection ?

Inspections can be dispatched by assigning an agent to the Inspection order. Inspections can also be dispatched from the Scheduler or by editing the Inspection Order.

Scheduler to Assign Inspections

Call Out #Description
1Unassigned Inspections in the Scheduler shows up in the grey box above. This box cannot be dragged. Double click on this box and it will pop-up an assign box shown below
2There is an Unassigned tasks section inside the scheduler. This can be dragged vertically to assign and horizontally to schedule the Inspection

If you clicked on the gray box in the unassigned section of the scheduler, a pop-up that says assign and schedule shows up.

Schedule and Assign

Call Out #Description
2You can assign the schedule by clicking on the calendar icon
3Click on view agent to select the agent
4Select the agent from the drop down and click on Assign. This would dispatch the Work Order
Was that helpful? Yes No